N-911

Odesa.

Odesa — latest news. Local events, transport, safety and city life.

City

Sidewalks are being repaired on Akademika Zabolotnogo Street in Odesa.

In Odesa, the "Barrier-Free Movement" project is ongoing, which involves repairing sidewalks on Akademika Zabolotnogo Street and Prince Volodymyr the Great Avenue. At the stretch from Kishinewskaya Street to David Oistrakh Street, 12 tram and 12 bus stops have been created, taking into account the principles of accessibility.

Odesa: Plans to allocate 154,2 million UAH for eight public water fountains, with the cost of each reaching 23 million UAH.

In Odesa, the construction of eight water fountains within the framework of an updated environmental program for 2022–2029 years is estimated at 154,2 million hryvnias – approximately a third of the total 451,3 million hryvnias of the program. According to an analysis by the Center for Public Investigation, four fountains in different areas were estimated at the same price – 23 million hryvnias, while the fountain in the "Enthusiasts" park was initially estimated at 4,5 million hryvnias. The document does not provide an explanation for this difference.

Odesa: The repair of two drainage pumping stations is estimated at 114,3 million UAH, with 100 million UAH coming from unspecified sources.

The updated environmental program for Odesa, covering the period from 2022 to 2029, includes major repairs to pumping stations No. 4 and No. 5, which are intended to prevent a major incident in the event of a breach in the Kadhibey Bay dike. Out of a total of 114,3 million hryvnias, only 14,3 million hryvnias have been allocated from the city budget for the period of 2022 to 2025, while 100 million hryvnias are planned to be raised from "other sources," which are not specified in the document.

Odesa: The city has divided responsibility for "Resilience Hubs" between departments and municipal services.

The local government of Odesa has divided responsibility for "Resilience Points" among departments, district administrations, and municipal enterprises. These entities are responsible for ensuring the readiness of the points, providing equipment, and replenishing supplies. For schools, food and drinking water will be purchased within the framework of municipal programs as needed.

Odesa after the second strike: municipal workers are clearing debris, and those affected may be eligible for compensation.

Late in the evening on October 10, Russian forces struck Odesa again: three apartments in a two-story building were destroyed, the roof caught fire, and firefighters extinguished the blaze. According to the Odesa Regional Military Administration, utility workers are clearing debris and repairing damage, and those affected may be eligible for compensation under one of two programs.

Kilia in Odesa is preparing backup power for apartment buildings for the winter.

In Kiliya, in the Odesa region, preparations are underway for backup power for apartment buildings that do not have alternative heating. Powerful generators will provide electricity through the "DTEK Odesa Networks" grid, in the event that a prolonged power outage makes it impossible to quickly restore supply. They are planned to be used only at low temperatures and according to the decision of the emergency response commission.

Odesa: Electricity was restored to almost 190 families in two days — DTEK

DTEK "Odeshchyna Elektromeren" announced that repair crews have restored electricity to almost 190 thousand families in Odesa and the surrounding region over the past two days. Work on electrical equipment is ongoing in Odesa: from October 8 at 08:00 to 18:00, some consumers will temporarily be without power.

Odesa has redistributed responsibility for resilience points among different services.

The head of the military administration of Odesa, Serhiy Lysak, signed an order to change the responsible parties for resilience points. District administrations will continuously monitor readiness, while municipal enterprises "ЖКС" will be responsible for supplies and equipment. Resilience points in shelters, schools, transportation, and the reintegration center will be the responsibility of the relevant departments.